Project

img

Project Overview

Location

Thai Hoa – Lien Son – Lien Hoa Industrial Park, Lien Hoa commune (now part of Phu Tho province), with a scale of 145.27 hectares (Phase 1), is an ideal industrial park for investors. Located near National Highway 2B and the Noi Bai – Lao Cai Expressway, this area offers convenient connectivity, opening up significant development opportunities.

Infrastructure Connectivity

The industrial park is designed with modern infrastructure, ensuring smooth internal transportation and efficient goods movement. Its strategic location facilitates easy access to major arterial roads, supporting production and logistics activities. Specifically, Thai Hoa – Lien Son – Lien Hoa Industrial Park is:
• 35 km (30 minutes) from Noi Bai International Airport
• 60 km (60 minutes) from Hanoi (Capital)
• 180 km (150 minutes) from Dinh Vu Port – Hai Phong

Scale

With an area of 145.27 hectares (Phase 1), the park offers flexible space, optimized to support a variety of production and service types, meeting the diverse needs of businesses.

Incentives

• Maximum land lease term of 50 years (2021-2071).
• CIT incentives are applied in accordance with Law No.67/2025/QH15 – the 2025 Law on Corporate Income Tax. We support investors in promptly accessing and fully benefiting from all applicable incentives.
• Land rental fee exemption for 10 years after the industrial park becomes operational.

Attractive Industries

01 Heavy Industry

Metal production (excluding refining and smelting of precious or non-ferrous metals).

Production of non-metallic mineral products (excluding glass manufacturing).

Automobile and other motor vehicle manufacturing.

Ready-Built Warehouses and Factories

Stavian Industrial Park Vĩnh Phúc offers ready-built warehouses and factories, designed with modern standards to meet international requirements. With flexible areas ranging from small to large, these facilities cater to various production and storage needs.

The synchronized infrastructure includes electricity, water, wastewater treatment, and convenient transportation links near National Highway 2B and the Noi Bai – Lao Cai Expressway, enabling businesses to start operations immediately.

This option not only saves construction time but also optimizes investment costs, providing an efficient and swift solution for enterprises looking to join Stavian Industrial Park Vĩnh Phúc  and embark on a sustainable development journey.

anh

Internal Infrastructure Documents

icon

Drainage System

• The industrial park’s rainwater drainage network includes channels with diameters D600-D2500 and box culverts made of B2500*3000 reinforced concrete.
• Rainwater drainage pipes are equipped with water collection manholes.
• Manhole spacing of approximately 30m ensures effective water collection during rainfall.

icon

Water Supply System

• Clean water supply capacity: 6,000 m³, maximum 8,000 m³/day-night.

icon

Electrical System

• Power capacity: 45 MVA, maximum 60 MVA.
• Planned 110kV substation with 150 MVA capacity by Q2/2026.

icon

Wastewater Treatment System

• Total capacity: 4,000 m³/day.
• Phase 1: 2,000 m³/day.
• Phase 2: 2,000 m³/day.

Documents

08.08.2025

Investment Guide: Detailed process and procedures.

Detailed Procedures and Processes
Download here
08.08.2025

Planning Map: Detailed layout of the industrial park zones.

Detailed Map of Industrial Park Areas
Download here
08.08.2025

Brochure: Images and introductory information.

Detailed Introduction to Stavian Vinh Phuc Industrial Park Project
Download here